Below is details of a recent shop fit out carried out by switch electrical, from survey and quotation to store fit out, including CCTV design and installation, electrical design and installation, fire alarm system design and installation, burglar alarm design and installation, building of partition walls for downstairs disabled toilet, food prep room, store room, 1st floor office and toilet on mezzanine floor, suspended ceilings, plumbing for downstairs toilet/food prep room / 1st floor kitchen area / 1st floor staff toilet and tea counter / 1st floor kitchen and laminate floor fitted through out.
This was an empty store when surveyed and only a 3 phase electrical supply was present in the building and a mezzanine floor.
Stud work for 1st floor office
Laying out studwork for disable toilet, food prep room and store room.
1st floor off plasterboard going on
Plasterbaord going on main walls from shop to disabled toilet / shop to store room
Suspended ceiling grid work going up
Shop electrics / CCTV / fire alarm system/ burglar alarm / cable trays installed
Toilet plumbing etc installed for disabled toilet
Staff kitchen created and installed
1st floor staff toilet plumbing and toilet accessories installed
Main shop laminate floor being fitted
Shop being fitted out with freezers/fridges
Painting and filling walls for shop store room area leading to food prep room
Suspended ceilings being fitted
Cold room installed and connected